
Engineering guidance. Examples and proposed workflows are illustrative.
Choose an asset and a decision
Start with one asset whose operating role and maintenance history are understood. Ask which developing condition the team needs to detect, what evidence would support it, and what action would become possible after review. SKF describes condition monitoring through operating measurements including vibration, speed, temperature, and load. Select measurements against the relevant failure mechanism and asset criticality, then define a review owner and escalation route before discussing a predictive model.
Verify the measurement chain before the algorithm
Record sensor location, orientation, mounting, unit, sampling settings, and calibration or verification history. Distinguish stored waveform data from summarized trend values, because they support different forms of investigation. Check that the acquisition system preserves outages, saturation, and stale values as visible quality states. A commissioning review should connect a known input or observation to the displayed result so the maintenance team understands what the signal can actually establish.
Compare like operating conditions
Group observations by the operating context that matters to the machine, such as speed, load, duty stage, and recent start or stop. Establish the initial reference using periods reviewed as suitable by maintenance engineers, and retain the reason for excluding other periods. When the process changes, show that change alongside the condition trend. A deviation from a reference is a prompt for investigation; its meaning depends on the machine and the quality of the comparison.
Combine evidence with known limitations
The US Department of Energy maintenance guide discusses oil analysis for lubricant condition, contamination, and machine wear. Thermal inspection provides another observation channel, with camera interpretation affected by emissivity and reflected temperature as FLIR documents. Connect sample reports and inspection images to the same asset and operating period, preserving collection details. Agreement between channels can strengthen a hypothesis, while disagreement should lead to a targeted inspection or measurement review rather than a hidden averaging rule.
Close the loop with the work order
Create a review record that links the observed deviation, supporting evidence, engineering interpretation, and proposed action. When work is performed, attach the inspection findings, replaced component, technician notes, and subsequent operating observations. This closes the evidence loop and gives future model evaluation a more reliable outcome label. Preserve cases where the suspected fault was not confirmed, because those cases are essential for understanding unnecessary alerts and weaknesses in the diagnostic logic.
Evaluate useful warning and review workload
Replay historical periods in chronological order and keep model-development periods separate from later evaluation periods. Measure how many alerts required review, how many were supported by findings, and whether there was enough time for the intended maintenance action. Report data gaps and the small number of confirmed events where relevant. An illustrative dashboard can demonstrate this workflow, but any claimed improvement needs a documented baseline, an evaluation period, and evidence from the actual maintenance process.
Technical references
See the next decision take shape.
Replay the evidence, look ahead, and compare the effect of an intervention on equipment condition or product quality.

Critical process pump · Drive-end bearing
A rotating asset shared by steel, mineral-processing, and energy operations.
- Observe the change
- Forecast the trend
- Compare an action
Compare an action
Inspect bearing condition, lubrication, and alignment; connect the finding to a maintenance task.
See the maintenance window before the limit.
A rising vibration trend becomes an inspection window. Replay its development, then compare continued operation with a planned bearing service.
The forecast uses only the evidence available at the selected point.
Inspect the data and forecast
Observed history
| Recorded hour | Bearing vibration · RMS (mm/s) |
|---|---|
| 0 | 1.45 |
| 8 | 1.48 |
| 16 | 1.5 |
| 24 | 1.56 |
| 32 | 1.67 |
| 40 | 1.8 |
| 48 | 2.02 |
| 56 | 2.28 |
| 64 | 2.59 |
| 72 | 2.91 |
Forecast from the selected observation
| Hours ahead | Forecast | With intervention |
|---|---|---|
| 0 | 2.88 | 2.88 |
| 12 | 3.3 | 3.3 |
| 24 | 3.72 | 1.79 |
| 36 | 4.13 | 1.58 |
| 48 | 4.55 | 1.55 |
How this forecast works
The forecast fits a straight-line trend to the last five available observations. Its envelope widens with recent variability and the distance into the future. The comparison applies a stated recovery response after an intervention; it is a scenario, not a diagnosed failure time.
- Review limit
- 4.5 mm/s
- Intervention after
- 12 h
- Recovery target
- 1.55 mm/s

Dracoverse · DRI shaft furnace
A furnace view connecting material flow, the gas circuit, and product evidence.
- Observe the change
- Forecast the trend
- Compare an action
Compare an action
Review the feed, reducing-gas conditions, and laboratory timing with the process team.
Follow quality drift into the next operating hours.
Connect product observations to the decision ahead. Compare continuation of the recent trend with an assumed feed-and-gas stabilization response.
The forecast uses only the evidence available at the selected point.
Inspect the data and forecast
Observed history
| Recorded hour | Product metallization (%) |
|---|---|
| 0 | 94.3 |
| 1 | 94.24 |
| 2 | 94.31 |
| 3 | 94.17 |
| 4 | 94.2 |
| 5 | 94.04 |
| 6 | 93.81 |
| 7 | 93.53 |
| 8 | 93.22 |
| 9 | 92.94 |
Forecast from the selected observation
| Hours ahead | Forecast | With intervention |
|---|---|---|
| 0 | 92.95 | 92.95 |
| 1.5 | 92.53 | 93.08 |
| 3 | 92.11 | 93.76 |
| 4.5 | 91.69 | 94.03 |
| 6 | 91.28 | 94.13 |
How this forecast works
The forecast fits a straight-line trend to the last five available observations. Its envelope widens with recent variability and the distance into the future. The comparison applies a stated recovery response after an intervention; it is a scenario, not a diagnosed failure time.
- Review limit
- 92 %
- Intervention after
- 1 h
- Recovery target
- 94.2 %
Interactive demonstration using an illustrative dataset. Review limits and intervention responses are scenario settings.
