What the twin connects
Dracoverse follows pellets from feed to discharge, with a parallel view of reducing gas and related equipment. Each measurement connects to an asset, a process area, and the operating state in which it was observed.
Engineering and validation
Build the tag inventory with process engineering, align historian and laboratory timestamps, and test the model on historical operating periods. Replay a feed change and compare the predicted response against available product observations.
The operator workspace
A process overview, comparable trends by operating period, equipment context, and a record of model assumptions. Measured points, estimated quantities, and delayed laboratory results each carry their provenance.
Systems and modules
Feed and shaft reduction
Follow the identity, quantity, and behavior of material through the shaft-furnace process.
Gas circuit and utilities
Connect the reducing-gas path and supporting utility systems to plant operation.
Product and equipment reliability
Review product quality, asset condition, and engineering findings against the same operating history.
Platform and decision services
Keep measurement provenance, scenario history, and engineering workflows available across plant units.
See the next decision take shape.

Critical process pump · Drive-end bearing
A rotating asset shared by steel, mineral-processing, and energy operations.
- Observe the change
- Forecast the trend
- Compare an action
Compare an action
Inspect bearing condition, lubrication, and alignment; connect the finding to a maintenance task.
See the maintenance window before the limit.
A rising vibration trend becomes an inspection window. Replay its development, then compare continued operation with a planned bearing service.
The forecast uses only the evidence available at the selected point.
Inspect the data and forecast
Observed history
| Recorded hour | Bearing vibration · RMS (mm/s) |
|---|---|
| 0 | 1.45 |
| 8 | 1.48 |
| 16 | 1.5 |
| 24 | 1.56 |
| 32 | 1.67 |
| 40 | 1.8 |
| 48 | 2.02 |
| 56 | 2.28 |
| 64 | 2.59 |
| 72 | 2.91 |
Forecast from the selected observation
| Hours ahead | Forecast | With intervention |
|---|---|---|
| 0 | 2.88 | 2.88 |
| 12 | 3.3 | 3.3 |
| 24 | 3.72 | 1.79 |
| 36 | 4.13 | 1.58 |
| 48 | 4.55 | 1.55 |
How this forecast works
The forecast fits a straight-line trend to the last five available observations. Its envelope widens with recent variability and the distance into the future. The comparison applies a stated recovery response after an intervention; it is a scenario, not a diagnosed failure time.
- Review limit
- 4.5 mm/s
- Intervention after
- 12 h
- Recovery target
- 1.55 mm/s

Dracoverse · DRI shaft furnace
A furnace view connecting material flow, the gas circuit, and product evidence.
- Observe the change
- Forecast the trend
- Compare an action
Compare an action
Review the feed, reducing-gas conditions, and laboratory timing with the process team.
Follow quality drift into the next operating hours.
Connect product observations to the decision ahead. Compare continuation of the recent trend with an assumed feed-and-gas stabilization response.
The forecast uses only the evidence available at the selected point.
Inspect the data and forecast
Observed history
| Recorded hour | Product metallization (%) |
|---|---|
| 0 | 94.3 |
| 1 | 94.24 |
| 2 | 94.31 |
| 3 | 94.17 |
| 4 | 94.2 |
| 5 | 94.04 |
| 6 | 93.81 |
| 7 | 93.53 |
| 8 | 93.22 |
| 9 | 92.94 |
Forecast from the selected observation
| Hours ahead | Forecast | With intervention |
|---|---|---|
| 0 | 92.95 | 92.95 |
| 1.5 | 92.53 | 93.08 |
| 3 | 92.11 | 93.76 |
| 4.5 | 91.69 | 94.03 |
| 6 | 91.28 | 94.13 |
How this forecast works
The forecast fits a straight-line trend to the last five available observations. Its envelope widens with recent variability and the distance into the future. The comparison applies a stated recovery response after an intervention; it is a scenario, not a diagnosed failure time.
- Review limit
- 92 %
- Intervention after
- 1 h
- Recovery target
- 94.2 %
Interactive demonstration using an illustrative dataset. Review limits and intervention responses are scenario settings.
Blue Waymark · Industrial engineering
Scope the first useful step
Choose one process boundary, identify its data owners, and agree how the pilot will be evaluated.