Blue Nova فا
Digital visualization of a direct-reduction plant with a shaft furnace and connected process data

Industrial engineering · Digital twins

Digital twins for industrial operations.

We connect equipment, process data, and engineering models so industrial teams can understand how their operations are performing.

Dracoverse · Direct reduction

Featured projects

All projects

See the next decision take shape.

Replay the evidence, look ahead, and compare the effect of an intervention on equipment condition or product quality.

Decision studio
Critical process pump · Drive-end bearing

Critical process pump · Drive-end bearing

A rotating asset shared by steel, mineral-processing, and energy operations.

  1. Observe the change
  2. Forecast the trend
  3. Compare an action

Compare an action

Inspect bearing condition, lubrication, and alignment; connect the finding to a maintenance task.

Explore predictive maintenance

See the maintenance window before the limit.

A rising vibration trend becomes an inspection window. Replay its development, then compare continued operation with a planned bearing service.

Current reading2.91 mm/s
Time to review limit47 h
At forecast horizon4.55 mm/s
Bearing vibration · RMS (mm/s)Review window identified
ObservedForecastReview limit

The forecast uses only the evidence available at the selected point.

Inspect the data and forecast

Observed history

Recorded hourBearing vibration · RMS (mm/s)
01.45
81.48
161.5
241.56
321.67
401.8
482.02
562.28
642.59
722.91

Forecast from the selected observation

Hours aheadForecastWith intervention
02.882.88
123.33.3
243.721.79
364.131.58
484.551.55
How this forecast works

The forecast fits a straight-line trend to the last five available observations. Its envelope widens with recent variability and the distance into the future. The comparison applies a stated recovery response after an intervention; it is a scenario, not a diagnosed failure time.

Review limit
4.5 mm/s
Intervention after
12 h
Recovery target
1.55 mm/s
Dracoverse · DRI shaft furnace

Dracoverse · DRI shaft furnace

A furnace view connecting material flow, the gas circuit, and product evidence.

  1. Observe the change
  2. Forecast the trend
  3. Compare an action

Compare an action

Review the feed, reducing-gas conditions, and laboratory timing with the process team.

Explore the DRI platform

Follow quality drift into the next operating hours.

Connect product observations to the decision ahead. Compare continuation of the recent trend with an assumed feed-and-gas stabilization response.

Current reading92.94 %
Time to review limit3.4 h
At forecast horizon91.28 %
Product metallization (%)Review window identified
ObservedForecastReview limit

The forecast uses only the evidence available at the selected point.

Inspect the data and forecast

Observed history

Recorded hourProduct metallization (%)
094.3
194.24
294.31
394.17
494.2
594.04
693.81
793.53
893.22
992.94

Forecast from the selected observation

Hours aheadForecastWith intervention
092.9592.95
1.592.5393.08
392.1193.76
4.591.6994.03
691.2894.13
How this forecast works

The forecast fits a straight-line trend to the last five available observations. Its envelope widens with recent variability and the distance into the future. The comparison applies a stated recovery response after an intervention; it is a scenario, not a diagnosed failure time.

Review limit
92 %
Intervention after
1 h
Recovery target
94.2 %

Interactive demonstration using an illustrative dataset. Review limits and intervention responses are scenario settings.

Industries

Examples of where our engineering capabilities can be applied.

About us · IGISCO

Born in steel. Built for industry.

Blue Nova began in steel and mining under IGISCO, Ghadir Iron and Steel Company. We bring that industrial foundation to engineering tools that help teams make smarter, faster, better-informed decisions.

Our approach

Contact

Start with one process, one asset, or one engineering question. Call our team to discuss the available data and a practical first scope.

Call Blue Nova
021–88875397
Tehran office
No. 1, 34th Street, Valiasr Street, above Saei Park, Tehran, Iran
Discuss your operation