Blue Waymark فا

DracoMine

An open-pit mining digital twin connecting exploration, extraction, ground-based wall monitoring, and the mineral-processing plant.

Exploration twin

Connect drillholes, samples, assays, and block-model versions. A planner can trace a grade estimate to the model version and see where additional observations would improve confidence.

Extraction and ground monitoring

Connect benches, fleet cycles and ore destinations with the location and timestamps of ground-based observations. Radar or survey prisms are representative inputs. Qualified site personnel interpret movement within the mine’s ground-control procedure.

Factory-style processing twin

Follow run-of-mine inventory into crushing and applicable separation, dewatering, and loadout. Pair the material record with controller signals, downtime, lab results, throughput and recovery. Use the resulting view to investigate reconciliation gaps.

Platform engineering

Systems and modules

Exploration

Connect field observations and laboratory evidence to a versioned geological model.

Extraction

Bring the mine plan, ground observations, fleet, and material movement into the shift workflow.

Mineral processing plant

Model the plant as a factory with equipment, process streams, quality measurements, and production records.

See the next decision take shape.

Decision studio
Critical process pump · Drive-end bearing

Critical process pump · Drive-end bearing

A rotating asset shared by steel, mineral-processing, and energy operations.

  1. Observe the change
  2. Forecast the trend
  3. Compare an action

Compare an action

Inspect bearing condition, lubrication, and alignment; connect the finding to a maintenance task.

Explore predictive maintenance

See the maintenance window before the limit.

A rising vibration trend becomes an inspection window. Replay its development, then compare continued operation with a planned bearing service.

Current reading2.91 mm/s
Time to review limit47 h
At forecast horizon4.55 mm/s
Bearing vibration · RMS (mm/s)Review window identified
ObservedForecastReview limit

The forecast uses only the evidence available at the selected point.

Inspect the data and forecast

Observed history

Recorded hourBearing vibration · RMS (mm/s)
01.45
81.48
161.5
241.56
321.67
401.8
482.02
562.28
642.59
722.91

Forecast from the selected observation

Hours aheadForecastWith intervention
02.882.88
123.33.3
243.721.79
364.131.58
484.551.55
How this forecast works

The forecast fits a straight-line trend to the last five available observations. Its envelope widens with recent variability and the distance into the future. The comparison applies a stated recovery response after an intervention; it is a scenario, not a diagnosed failure time.

Review limit
4.5 mm/s
Intervention after
12 h
Recovery target
1.55 mm/s
Dracoverse · DRI shaft furnace

Dracoverse · DRI shaft furnace

A furnace view connecting material flow, the gas circuit, and product evidence.

  1. Observe the change
  2. Forecast the trend
  3. Compare an action

Compare an action

Review the feed, reducing-gas conditions, and laboratory timing with the process team.

Explore the DRI platform

Follow quality drift into the next operating hours.

Connect product observations to the decision ahead. Compare continuation of the recent trend with an assumed feed-and-gas stabilization response.

Current reading92.94 %
Time to review limit3.4 h
At forecast horizon91.28 %
Product metallization (%)Review window identified
ObservedForecastReview limit

The forecast uses only the evidence available at the selected point.

Inspect the data and forecast

Observed history

Recorded hourProduct metallization (%)
094.3
194.24
294.31
394.17
494.2
594.04
693.81
793.53
893.22
992.94

Forecast from the selected observation

Hours aheadForecastWith intervention
092.9592.95
1.592.5393.08
392.1193.76
4.591.6994.03
691.2894.13
How this forecast works

The forecast fits a straight-line trend to the last five available observations. Its envelope widens with recent variability and the distance into the future. The comparison applies a stated recovery response after an intervention; it is a scenario, not a diagnosed failure time.

Review limit
92 %
Intervention after
1 h
Recovery target
94.2 %

Interactive demonstration using an illustrative dataset. Review limits and intervention responses are scenario settings.

Blue Waymark · Industrial engineering

Scope the first useful step

Choose one process boundary, identify its data owners, and agree how the pilot will be evaluated.

Discuss your operation